McMullin Group
It was wall to wall timber at our Camberwell project, and fair to say, we are very satisfied with the end result. Working with a fantastic client, we designed this space and then constructed on a very limited time schedule. The fitout utilised kilometres of oak cladding, American Oak timber tables, polished concrete veneer, black powdercoated windows and a huge amount of built in storage. With tight stair access and a level 3 site, the use of a crane was a godsend for site loading and gave the Camberwell locals something to watch!
Thanks to the McMullin Group for allowing us to work with you on another one of your projects and well done to everyone in our team who smashed out another great fitout!